Project Monitoring: The debt isn't the problem. The paperwork is.

Writer: Joe Garner
Joe Garner
Aug 20
5 min read

Updated: Sep 25



Why half-built schemes lose more value in the filing cabinet than they ever did on site.

The scaffold stays up long after the work has stopped on a stalled site. The hoarding still carries a name the lender would rather not see. Somewhere in a van there is a lever-arch file that nobody can find. By the time we get the call, everyone involved has already decided what the problem is. The lender thinks it is a valuation problem. The borrower thinks it is a cash problem. The insolvency practitioner thinks it is a recovery problem.


In our experience it is almost never any of those. It is a measurement and evidence problem. The reason so much value evaporates from distressed development is that the industry sends the wrong professional through the gate first.


How the money actually goes missing

The loss builds on interim valuations, one increment at a time.


Monthly drawdowns get certified against work that is nearly in place rather than actually in place. A groundworks package is signed off with the drainage untested. Materials on site are valued without a vesting certificate. A preliminaries recovery gets waved through because the programme still says the scheme will finish. Each decision is defensible on its own. By month nine the lender has advanced against work that isn't there.


Then the contractor fails, or the developer runs out of equity, and the site stops. That is where the second, larger loss begins. It has nothing to do with construction.


When work restarts, someone has to prove what was built, not just describe it. Which foundations were inspected, and by whom. Whether the initial notice is still live or lapsed since the approved inspector went under. What sits behind the plasterboard. What the fire stopping looks like. Whether the cavity barriers were installed to the detail or to the operative's judgement. On a site with no records and no continuity of building control, the honest answer is that nobody knows. The only way to find out is to open up finished work and pay to put it back.


A part-built scheme with a clean, continuous compliance record and a part-built scheme with the same bricks and no record are not close as assets. One has an exit. The other has a research project.


Why this is arriving in volume now

Construction remains the worst-hit sector in the insolvency data. 3,803 firms failed in the year to May 2026, 17% of all cases nationally, according to the Insolvency Service. BTG Consulting's Red Flag Alert put 9,466 construction firms in critical financial distress in Q1 2026, with significant distress in the sector up 10.5% year on year. Failures are landing mid-package, once work is underway.


The facilities were written hot. Development lending at 70-75% loan-to-GDV, on gross development values that in a fair number of cases were never supported by proper comparable evidence, leaves no equity cushion. A 15% cost overrun on those numbers does not dent the profit. It eliminates the borrower and starts eating the debt.


The change most people haven't priced in is that compliance is now a hard gate. Under the Building Safety Act, the evidence is the permission. Around 1,500 Gateway 2 applications are in progress with the Regulator this summer, and transitional cases, where the original building control body has gone under, are the hardest to move because the evidence was never captured. Finished homes are sitting empty waiting for sign-off. On a stalled scheme, that gate is where the exit dies.


The sequencing is wrong

The standard response to a defaulted development loan is to instruct a valuer, bring in an insolvency practitioner if things are bad enough, and add a monitoring surveyor as support.


That gets it backwards. A valuation answers what a scheme is worth, given a set of assumptions. On a distressed site, cost to complete, compliance status and remedial scope are all unknown. Feed in guesses and the number that comes out has no basis, and every decision that follows gets anchored to it.


The first job is unglamorous: measure what's physically in place, reconcile it against the drawdowns to find the real gap between debt and asset, schedule the defects and non-compliant work, then audit what compliance evidence exists and price the recovery of what doesn't, as its own workstream rather than a line in the prelims. That gives you a cost to complete. Then a valuation means something.


That work takes a fortnight on most schemes and it changes the answer more often than not, in both directions. I have seen positions that looked terminal turn out to be a funding gap of a few hundred thousand and a live initial notice. I have also seen schemes where the compliance recovery alone made completion uneconomic, and the right advice was to stop, market it part-built, and take the hit now rather than in eighteen months.


This is the work we do at Axo. A boutique cost consultancy is the natural home for it, and the failures come in every form. Ground-up residential where the groundworks priced at twice the allowance and the contractor never recovered. Conversions and change of use where the existing structure turned out to be worse than the survey suggested. Mixed-use blocks where the fire strategy changed after the frame went up. The common thread is a cost plan that stopped matching reality months before anyone admitted it, and nobody re-measured. Re-establishing the real number on a part-built asset is a discipline we apply every week on schemes that are perfectly healthy. Doing it on one that has failed is the same work under worse conditions.


The economics reward getting this right early

Once you have a costed, programmed, evidenced position, options open up. Incumbent lenders will grant a standstill against a plan with a funder in view. They will not grant one against a request for patience. Development exit finance exists in reasonable depth for schemes that can demonstrate a path to a completion certificate. A developer-led consensual sale, taken at a normal pace with the lender's cooperation, reliably beats a receivership sale where the site is enforced and the borrower is sidelined.


Every one of those routes depends on the same thing: a credible number and a compliance path. Neither is available without the measurement work.


What I would say to a lender.

Stop asking what the site is worth. Ask what's in the ground, what it costs to finish, and whether you can prove any of it. If you can't prove it, that's your recovery problem.


There is one more thing worth saying, because it is where most reviews of this kind fall down. A report that tells you the position and then stops is only half useful. Somebody still has to re-procure the packages, hold the fixed prices, run the opening-up works, rebuild the compliance record and get the certificate issued. We do that part too, and we would rather be judged on whether the scheme reached its exit than on the quality of the document. The industry has spent a long time confusing the two.


The most expensive thing on any site is work you cannot evidence. On a distressed scheme, that's the difference between an asset and a liability.


If you are holding a scheme in default, or advising on one, the first fortnight is where the value is won or lost. That conversation is worth having early.


Joseph Garner is a director at Axo Consulting, a boutique real estate cost consultancy. Axo advises lenders, receivers and developers on development schemes in difficulty, from cost-to-complete and compliance recovery through to delivery and exit.