The warning signs a monitor sees first

Writer: Joe Garner
Joe Garner
3 days ago
2 min read
A building under construction with an unfinished timber roof

Glenigan’s November index shows the value of work starting on site fell 9% over the three months to October and was 21% lower than the same period last year. Residential has fared worse, with starts down 29% on 2025 levels.


When the market shrinks, contractors feel it before anyone else. There are fewer jobs to bid for, so prices get sharper to win them, and the cash from new work that used to carry the schemes already on site starts to dry up.


As a monitor I usually see the strain months before an insolvency. The site gets quieter, and it’s the same handful of operatives on every visit. Subcontractors walk off because they haven’t been paid. Valuations start running ahead of the work, with preliminaries and early packages claimed before they’re earned, because the contractor needs the cash now. Materials arrive late or in small drops as suppliers move the contractor onto pro-forma terms. Any one of these can have an innocent explanation. Seen together over two or three visits, they’re enough for me to advise the lender to check the contractor’s finances before the next drawdown.


Spotting the signs on site is useful. Catching the cause earlier is worth more, and much of the cause is priced in at tender. A contract won on a thin margin, with the groundworks and substructure under-priced, runs out of money partway through however good the builder is. Below ground is where most of the unknowns sit, and it’s the first place a work-hungry contractor trims to get the number down.


That’s why the initial review matters. Before the first drawdown, the monitor examines the building contract and the cost plan on the lender’s behalf. If the contract sum looks light against the scope, or the provisional sums for groundworks look optimistic, it goes in the report while there’s still time to deal with it through a revised price or a larger contingency. An unbuildable price hurts the contractor as much as the funder, and flagging it on day one is far cheaper than discovering it in month eight.


At Axo Consulting we treat the initial review as the most important stage of a monitoring appointment. In a market like this one, it’s where a lender gets its best protection.


Talk to Axo about project monitoring. Email us at info@axoconsulting.co.uk


Joe Garner MRICS is the co-founder and director of Axo Consulting